HSEES April 2024 deadlines reminder

Since April 8, 2024, new commercial and industrial buildings must incorporate an automation and control system from 70 kW of power.

Marie Faucon
EHS Consultant
Update : 
12.09.2025
Publication: 
15.04.2024

08/04/2024: Obligation to install a building automation and control system in new buildings

The obligation to install a building automation and control system applies to new buildings (building permits submitted after April 8, 2024):

  • in which market or non-market tertiary activities are carried out, including those belonging to legal entities (companies, associations, etc.) in the primary (agriculture) or secondary (industry) sectors,
  • AND equipped with a heating system or an air-conditioning system, whether or not combined with a ventilation system, with an effective power rating of more than 70 kW.

Note: until now, new tertiary buildings were only concerned if their rated output exceeded 290 kW.